Friday, August 7, 2026

‘Yet another step’: NASA astronauts conduct 6.5-hour spacewalk to prep ISS for photo voltaic array improve


Two NASA astronauts put in the seventh and closing set of mounting {hardware} for brand new units of photo voltaic arrays throughout a profitable 6.5-hour spacewalk outdoors of the Worldwide House Station.

Jessica Meir and Anil Menon on Thursday (Aug. 6), assembled the modification equipment for one of many area station’s eight energy channels, which is able to permit for the long run addition of a brand new ISS Rolll-Out Photo voltaic Array (iROSA). Since 2021, astronauts on prior spacewalks have deployed six of the iROSA assemblies, leaving now simply two awaiting supply to the station later this yr.

Like constructing a large erector set, Meir and Menon labored to assemble and bolt collectively the triangular brackets on the 3B energy channel, situated on the far proper, or starboard (S6) section of the station’s spine truss. Menon was positioned on an articulating transportable foot restraint (APFR) atop a worksite interface (WIFEX), offering a steady angle to work from the truss.

NASA graphic displaying the augmentation plan for the ISS Roll-Out Photo voltaic Arrays (iROSAs), together with the place work has been accomplished and the place work continues to be wanted previous to a spacewalk that put in the mounting {hardware} on energy channel 3B on Thursday, Aug. 6, 2026. (Picture credit score: NASA)

As soon as the modification equipment construction was constructed and secured to the 3B mast canister, the 2 spacewalkers routed cabling that can carry the electrical energy from the long run iROSA into the 3B energy channel after which lined the struts with multi-layer insulation to guard them from micrometeoroid strikes.

Related Articles

Latest Articles